600T/H river stone production line in INDONESIA
INDONESIA is rich in many mineral resources.The project is located in Surabaya,raw material uses local river stones,From working place inspection to program planning, from installation and commissioning to well operation,Sinogomine always pursue value and benefit from the perspective of customers.In the face of adverse terrain of the production site.a river stone production line with the Sinogomine mark was successfully installed.
Processed material: river stone
Production: 600 t/h
Input material size: 500mm
Output material size: 0-5mm, 5-20mm, 20-35mm Project start: May,2021